Arcadia Flooring

Unit 1,

100 Slade Green Road

Erith, Kent, DA1 4SL

Tel: 01322 526 496

sales@arcadiaflooring.co.uk

Projects

As we look back on 2017  some of the great opportunities we had, which have included fitting completing the final phases of Holy Lodge Estate in NW London, Multiplex at Centrepoint London, Lords cricket ground and Twickenham Stadium as well as various schools and medical facilities, Goldsmiths and London University, St Georges Hospital and several residential new build projects.  We've also added some new snazzy new kit to our  toolbox and introduced Whiterock and PVC wall cladding to our range of services.  Once again It was a busy year here at Arcadia Flooring and we look forward to new opportunities to work on some exciting projects in 2018

 

Holy Lodge Estate, NW London

Supplied and installed Forbo Marmoleum to various common areas, including  lobbies, stairs and corridors to the various apartment blocks. Stairs were fitted with Gradus nosings and inserts and entrances were fitted with Logo mats into matwells. 

We continue towork on new phases of this project and will share photos soon!

Hook Lane School, Kent

Here we supplied and installed Altro Whiterock wall clading in various colours throughout the kitchen and food preparation areas. It is a fantastic product and is definietly becoming very popular, especially becuase it is easy to keep clean in medical and catering facilities.

Bloomberg (London)

Supplied and installed approximately 3500m2 Altro Walkway (www.altro.co.uk/Altro-Walkway) with approximately 2000 linear meters of Gradus Sit-on Skirting (www.gradusworld.com/p-range-skirtings)  Arcadia have had to work to a tight schedule on this one and the finish looks great! positive feed-back from our client and the end user makes the team feel great, a job well done!

Mar City Homes Greenpoint, Collindale

Supplied and installed Tarket ID40 (www.idselection40.tarkett.com/) and

Polyflor Expona (www.polyflor.com/jh/products.nsf/products!open&family=lux&prodcode=ec2) to various apartments and common areas, including  lift lobbies, stairs and corridors to the 7 storey apartment building on London’s Edgeware Road. 

Navigation court

500m2 of JHS Universal (www.jhscarpets.com/specifications/Universal_Tones_Spec_Sheet2.pdf)  to corridors and communal areas in this 7 storey building.

 

Other projects we have been fortunate to work on include:

Various schools and medical centres across London and Kent, continuous service as part of a maintenance and repairs service within Bexley borough, Islington council offices, communal corridors and stairs and the opportunity to restore parquet flooring at the National Portrait Gallery in London. 

Previous projects include:

  • London Fashion School – Annex Building

  • Bloomberg – Temple Of Mithras

  • Royal Borough Greenwich – Various Works including Birchmere Centre

  • Sevendroog Castle

  • Glebe Housing—Various and ongoing works to residential homes and facilities

  • Luxury Carpet, Corinthia Apartments, Whitehall

  • 2600m2 Carpet, Erith Apartment Blocks

  • Various — Royal London Borough of Greenwich& Islington

  • Various — St Barts & Royal London Hospitals

One of Arcadia’s earliest projects, Battersea Fields Estate, really demonstrates Arcadia Flooring’s ability to source, supply, fit and meet an incredibly tight schedule.  The project was to fit over 6000M2 of Altro safety flooring to semi exposed communal corridors, lobbies, landings and staircases also fitted with Gradus Stair nosings  to 14 blocks of flats in an urban council estate in London.  The fitting schedule was extremely tight and included working through the night for several weeks to avoid disruption to residents. 

Print Print | Sitemap
© Arcadia Flooring